Case Studies > Cheval Property Management Limited > Moreau House

Location; Moreau House, 116 Brompton Rd, Knightsbridge SW7 4ES

Client Requirement

CAT A refurbishment of 5,000 ft2 1st floor office space, refurbishment of the reception and main stairwell, Full external redecoration and masonry repairs. on behalf of the landlord.

Cat A Fit Out; returning 5,000 ft2 of offices and meeting rooms back to open plan.

Works included:
1st Floor office

Reception and stairwell

Externally

Challenges

Timeframe: The most challenging aspect of this project was the fact that the work could only be undertaken whist the rest of the building was occupied. This was further complicated by two residential flats on the top floor which severely restricted the time available for drilling and demolitions.

Safe methods of working needed to be developed within the stairwells which where the only means of access to the floors by the occupants and residents of the top floor apartments.

Programme: As a result of the timeframe and the risks of associated with tenant access, detailed planning and risk assessments were carried out for all phases. In addition, specific milestone dates where fixed for IT and comms switch over.